JN Benley – Adwick le Street Service reservoir.
Framework contractors JN Bentley Ltd in a joint venture with Mott MacDonald are providing service reservoir structures to Yorkshire Water AMP 5 programme. MMB and Carlow Precast have worked together to provide a cost effective modular precast concrete solution.
This provides a streamlined design process that can easily be adapted to most of the AMP 5 service reservoir site.
|
|
 |
 |
|
-
 |
George Leslie Ltd – Newton Stewart STW
AMP 5 Framework contractors George Leslie Ltd in a joint venture with Biwater worked with Scottish water to provide new structures to the Newton Steward STW site.
Carlow Precast worked with this joint venture to design, manufacture, deliver and install a modular precast concrete aeration and two final settlement structures on this site.
|
|
 |
| |
|
-
 |
Seymour Civil Engineering Ltd and C & A Pumps – Otterburn Close Flood Alleviation
Northumbrian Water AMP 5 framework contractors Seymour Civil Engineering Ltd worked with consulting engineering firm MWH and Carlow Precast to provide a cost effective combined flood alleviation structure on their Otterburn Close site.
The precast concrete modular system has proven to be one of the most cost effective solutions for combined storage on numerous sites in the Northumbrian Water region.
|
|
 |
 |
|
-
 |
@ One Alliance – Colchester STW
The @one Alliance is a collaborative organisation formed to deliver a large part of the Anglian Water AMP5 framework investment programme. It comprises seven partners; Anglian Water Engineering (AWEng), Balfour Beatty Utility Solutions Limited (BBUSL), Barhale, Biwater, Black & Veatch, Grontmij and Skanska Aker Solutions.
Carlow Precast have worked with @ one Alliance to design, manufacture, deliver and install a precast concrete UV channel structure for their Colchester STW. Carlow Precast are also approved for final settlement structures for the AMP 5 period.
|
|
 |
| |
|
-
-
 |
Persimmon Homes – Panteg
Persimmon Homes are one of the UK’s largest house builders and have used Carlow Precast modular stormwater attenuation systems on many of their sites in the UK. On the Panteg site Persimmon Homes engaged Carlow Precast design team at an early stage to identify cost saving’s on the project.
Our design engineers identified that storage could be combined in one large structure thus presenting Persimmon Homes with massive saving’s on this project. This structure has now been adapted by Welsh Water under section 104.
|
|
 |
| |
|
-
-
 |
Taylor Wimpey – Battledown Park, Oakley, Cheltenham
Taylor Wimpey are one of the largest UK house builders and have used Carlow Precast on numerous sites throughout the UK.
Carlow Precast offered a very cost effective storm water modular precast concrete attenuation solution on the this site.This tank has now been adopted under section 104 by Severn Trent Water.
|
|
 |
| |
|
-
 |
Roadform Civil Engineering Co Ltd – RNSD Site, Exeter.
Roadform Civil Engineering Co Ltd are one of the leading civil engineering contractors in the South West of England and have used Carlow Precast on a number of their sites to provide a precast concrete modular stormwater attenuation solutions.
South West Water have approved this structures under Section 104.
|
|
 |
| |
|
|