|
In combined sewer areas (storm & foul) there will occasionally be the problem of excessive flow. Unless diverted this will cause overloading of the treatment works.
The CSO reduces the hydraulic loading on the treatment plant by diverting dilute excess flow to appropriate alternative drains.
Carlow Precast Engineers can design precast alternatives for most applications therefore reducing installation times and costs


|

Barhale Construction – Provan Mill CSO (10m deep structure) – Scottish Water
|